Infra-tec-gh engineers has gotten two new water project at Nkwantakese.
The projects are :
150928 water project, manager: David.,
150929 water project, manager: Sulley
BLOG-LINKs
GSE-p1a is Stephen http://gsep1.blogspot.ch/ ... BLOG-Overview ...
GSE-p1b is David http://gsep4david.blogspot.ch/ ...
GSE-p1c is Sulley http://sulleymustapha.blogspot.com/ (this BLOG) ...
GSE-p1d is Emmanuel http://gsep2.blogspot.com
GSE-p1b is David http://gsep4david.blogspot.ch/ ...
GSE-p1c is Sulley http://sulleymustapha.blogspot.com/ (this BLOG) ...
GSE-p1d is Emmanuel http://gsep2.blogspot.com
Wednesday, 30 September 2015
Friday, 25 September 2015
Thursday, 3 September 2015
4. Sept 2015 No info
About what is going i did not see any info !
The drilling position can be as well at the 6 plot place ... check for the best place in all 10 plots ..
... and where are the prises and phone Nr from the workers in Mampong ?
( el, plumb, plast,..)
The drilling position can be as well at the 6 plot place ... check for the best place in all 10 plots ..
... and where are the prises and phone Nr from the workers in Mampong ?
( el, plumb, plast,..)
Tuesday, 1 September 2015
Trip to Mampong Nord, Waterstation project Land Site
On the 31st of August 2015 Infratec-GH Team visited the land site at Mampong for their first project.
The member of the team which join the trip was Mr. Panford, Mr. Sulley, Mr. David.
We set-off for Mampong at 9:10 am and returned at 4:30 pm.
Gloria was contacted at Mampong, and took us to the land site and around town.
The whole land was identified and the specific part for the for the borehole project was also identified including the marked stone which shows the boundaries of the land.
Pictures of the land and marked stones is posted below.
https://drive.google.com/open?id=0B29Q6crFvCxKflNCamtGRWVfMEdfaHV0OTlyLVZET3I0YjNkMWNwZUxqYTdWMFJXZnNR
The member of the team which join the trip was Mr. Panford, Mr. Sulley, Mr. David.
We set-off for Mampong at 9:10 am and returned at 4:30 pm.
Gloria was contacted at Mampong, and took us to the land site and around town.
The whole land was identified and the specific part for the for the borehole project was also identified including the marked stone which shows the boundaries of the land.
Pictures of the land and marked stones is posted below.
https://drive.google.com/open?id=0B29Q6crFvCxKflNCamtGRWVfMEdfaHV0OTlyLVZET3I0YjNkMWNwZUxqYTdWMFJXZnNR