Wednesday 30 September 2015

Trip to New Project site at Nkwantakese

Infra-tec-gh engineers has gotten two new water project at Nkwantakese.
The projects are :

150928 water project, manager: David.,

150929 water project, manager: Sulley



Thursday 3 September 2015

4. Sept 2015 No info

About what is going i did not see any info !

The drilling position can be as well at the 6 plot place ... check for the best place in all 10 plots ..

... and where are the prises and phone Nr from the workers in Mampong ?

( el, plumb, plast,..)

Tuesday 1 September 2015

Trip to Mampong Nord, Waterstation project Land Site

On the 31st of August 2015 Infratec-GH Team visited the land site at Mampong  for their first project.
The member of the team which join the trip was Mr. Panford, Mr. Sulley, Mr. David.
We set-off for Mampong at 9:10 am and returned at 4:30 pm.
Gloria was contacted at Mampong, and took us to the land site and around town.
The whole land was identified and the specific part for the for the borehole project was also identified including the marked stone which shows the boundaries of the land.
Pictures of the land and marked stones is posted below.

https://drive.google.com/open?id=0B29Q6crFvCxKflNCamtGRWVfMEdfaHV0OTlyLVZET3I0YjNkMWNwZUxqYTdWMFJXZnNR

Site Plan



This diagram is designed by Mr.Sulley
Time used : 2hour