On the 31st of August 2015 Infratec-GH Team visited the land site at Mampong for their first project.
The member of the team which join the trip was Mr. Panford, Mr. Sulley, Mr. David.
We set-off for Mampong at 9:10 am and returned at 4:30 pm.
Gloria was contacted at Mampong, and took us to the land site and around town.
The
whole land was identified and the specific part for the for the
borehole project was also identified including the marked stone which
shows the boundaries of the land.
Pictures of the land and marked stones is posted below.
https://drive.google.com/open?id=0B29Q6crFvCxKflNCamtGRWVfMEdfaHV0OTlyLVZET3I0YjNkMWNwZUxqYTdWMFJXZnNR